Bookmark and Share

Blog by Ben Schmidt

<< back to article list

Building Entlebucher: Kitchen Almost Done

 



Ben Schmidt of www.benschmidt.tv a Fredericton NB and Oromocto NB Real Estate Agent video blogs about Building Entlebucher

 

So we've got the top soil to delivered, and ready to be leveled out. Lawn is going to look fantastic! We've got the gravel in for the back deck and for under the new shed we just installed.

Inside, we've got the hardwood laid for the main floor, and tile done in the entrance way and bathrooms. The kitchen cabinets are installed and waiting for its countertop, doors and fixtures. Kitchen has a fantastic walk-in pantry.

In the basement we've framed in the natural gas heat pump vents, the bathroom and the fifth bedroom, with a walk-in closet. We're going to be putting up the gyp-roc today!

Top floor, the tile is laid in the bathroom and the counter is in. In the master bedroom the master bath has the corner tub installed, and we're ready for the sink, flush and corner shower. 

If you have any questions about new construction or a question for a Realtor in general give me an email at ben.schmidt@me.com